Engineering news

M62 smart motorway saves drivers 30 minutes a week

PE

Smart motorway
Smart motorway

Smart motorway helps tackle stop-start conditions by using the variable speed limits and opening up the hard shoulder

Drivers using the M62 smart motorway are saving up to 30 minutes each week, according to the latest statistics.

The £136 million Highways England scheme between Brighouse and Rothwell, which was finished in 2013, is designed to deliver better journeys for motorists in the busiest periods.

People travelling westbound in the evening towards Brighouse are saving almost five minutes each day, according to the statistics.

The study also shows that the journey time savings have been achieved as the number of drivers using the 15.5 mile stretch of the M62 between junction 25, Brighouse, and junction 30, Rothwell, has increased.

An average of 155,000 vehicles use the busiest stretch of the route between junction 26 (Chain Bar) at Bradford and junction 27 for the M621 every day – an increase of 6%.

Roger Wantling, service delivery team leader for Highways England, said: “These latest figures show that the smart motorway really is making a difference to people’s lives saving commuters an average of 30 minutes a week, which works out at over a day a year.

“The smart motorway helps tackle the stop-start conditions many of us have experienced in the past, using the variable speed limits and opening up the hard shoulder on parts of the M62 during busy times to target congestion.”

The smart motorway uses the latest technology to monitor traffic levels and variable speed limits are displayed on overhead electronic signs to keep vehicles moving.

CCTV is used 24 hours a day to enable staff in Highways England’s regional control centre in Wakefield to respond quickly to incidents.

Analysis of data for collisions which resulted in injury before shows that the annual average number of collisions on the M62 between J25-30 has decreased by 34% (22.8 collisions per year).

Share:

Professional Engineering magazine

Current Issue: Issue 1, 2025

Issue 1 2025 cover
  • AWE renews the nuclear arsenal
  • The engineers averting climate disaster
  • 5 materials transforming net zero
  • The hydrogen revolution

Read now

Professional Engineering app

  • Industry features and content
  • Engineering and Institution news
  • News and features exclusive to app users

Download our Professional Engineering app

Professional Engineering newsletter

A weekly round-up of the most popular and topical stories featured on our website, so you won't miss anything

Subscribe to Professional Engineering newsletter

Opt into your industry sector newsletter

Related articles